Sundvall Bridge Transport
Service Division, Marine/Naval
OVERDICK analyzed the motion behavior of transport barges for the transport of bridge sections in the Baltic Sea. Nine bridge sections with weights up to 2.400t and lengths up to 150m were transported from Poland to Sweden.
OVERDICK performed a multi-body motion analysis for direct and phase correct calculation of the bridge reaction loads for the seafastening.
- Client
- SARENS2012
- Location
- Baltic Sea, Germany
- Keywords
- Hydrostatics, Motion Analysis, Services
- Engineering Services
-
Motion Analysis
Multibody Analysis - Motion Analysis
- Multibody Analysis
- Map
-
- Other Projects in this Category
- Pile Transport Rack and Supporting Cantilever… North Sea
- BR-D Riser Guard Design South China Sea
- Pile Guiding Tool Wigging Island, Australia
- Lifting Analysis worldwide
- Lifting of Barge KURT North Sea
- Seafastening for Tripod Foundations North Sea
- Mooring Analysis worldwide
- Multi-body Mooring Analysis worldwide
- Motion Analysis for Transport of new Panama C… Adriatic Sea
- Tripod Handling Tools German North Sea